Fig. 3From: Integrated cost-benefit analysis of tsetse control and herd productivity to inform control programs for animal African trypanosomiasisBenefit-cost ratios of the control scenarios under different perturbations to the initial parameters (median, 5th and 95th percentiles). Details of the perturbation to the scenarios: A (original scenario), B (+ 25% on intervention costs), C (+ 25% on intervention costs), D (final incidence 10%)Back to article page